Deliverable Report D2.7 Prototype 1st version

URL: http://opendata.waterjpi.eu/dataset/28104022-5a17-4a22-b405-3abb29884d0d/resource/ae6892e0-c3ce-410b-b003-034e6d1f770e/download/d2.7_serpic_v03_public.pdf

This deliverable presents the most significant results from the construction of the initial version of the SERPIC treatment plant. The construction process involved receiving all units comprising the prototype plant at the facilities of the University of Castilla-La Mancha (UCLM) in Ciudad Real, Spain. This milestone enabled the completion of tasks 2.1 through 2.8. The previous stage, nanofiltration, is seamlessly integrated into the prototype, along with the two treatment routes. Route A includes the disinfection tank and the ozone gas electrogeneration unit, while Route B encompasses the membrane photoreactor and the persulfate electrogeneration unit. Before this stage, a preliminary prototype plant featuring a reverse osmosis membrane and a custom- designed photoreactor by UCLM was developed to study the hydrodynamics of the plant prior to the integration of all technologies.

There are no views created for this resource yet.

Additional Information

Field Value
Data last updated February 10, 2025
Metadata last updated unknown
Created unknown
Format PDF
License Other (Non-Commercial)
Authors M. Pilar Castro, Ángela Moratalla, Ismael F. Mena, Cristina Sáez, Manuel A. Rodrigo, Paola Verlicchi, Ana I. Gomes, Carla Santos, Vítor Vilar, Jan Gäbler
Publication date August 27, 2024
Access level info:eu-repo/semantics/openAccess
Version unknown
Created 14 days ago
Media type application/pdf
Size 1,524,981
format PDF
id ae6892e0-c3ce-410b-b003-034e6d1f770e
last modified 14 days ago
license id other-nc
license title Other (Non-Commercial)
on same domain True
package id 28104022-5a17-4a22-b405-3abb29884d0d
position 23
revision id a5e6b5b3-a83a-471c-ad68-69f59eee12da
state active
url type upload