Deliverable Report D2.7 Prototype 1st version
This deliverable presents the most significant results from the construction of the initial version of the SERPIC treatment plant. The construction process involved receiving all units comprising the prototype plant at the facilities of the University of Castilla-La Mancha (UCLM) in Ciudad Real, Spain. This milestone enabled the completion of tasks 2.1 through 2.8. The previous stage, nanofiltration, is seamlessly integrated into the prototype, along with the two treatment routes. Route A includes the disinfection tank and the ozone gas electrogeneration unit, while Route B encompasses the membrane photoreactor and the persulfate electrogeneration unit. Before this stage, a preliminary prototype plant featuring a reverse osmosis membrane and a custom- designed photoreactor by UCLM was developed to study the hydrodynamics of the plant prior to the integration of all technologies.
There are no views created for this resource yet.
Additional Information
Field | Value |
---|---|
Data last updated | February 10, 2025 |
Metadata last updated | unknown |
Created | unknown |
Format | |
License | Other (Non-Commercial) |
Authors | M. Pilar Castro, Ángela Moratalla, Ismael F. Mena, Cristina Sáez, Manuel A. Rodrigo, Paola Verlicchi, Ana I. Gomes, Carla Santos, Vítor Vilar, Jan Gäbler |
Publication date | August 27, 2024 |
Access level | info:eu-repo/semantics/openAccess |
Version | unknown |
Created | 14 days ago |
Media type | application/pdf |
Size | 1,524,981 |
format | |
id | ae6892e0-c3ce-410b-b003-034e6d1f770e |
last modified | 14 days ago |
license id | other-nc |
license title | Other (Non-Commercial) |
on same domain | True |
package id | 28104022-5a17-4a22-b405-3abb29884d0d |
position | 23 |
revision id | a5e6b5b3-a83a-471c-ad68-69f59eee12da |
state | active |
url type | upload |